CONSTRUCTION MANAGEMENT

Sandouville – France

A foreman took over for ABB, the project management to change the line of paint application Renault with additions and shifts of robots. We also made the changes in the distribution of paint.

CONTROL OF WORK

Romilly – France

We ensured the establishment of a temporary tunnel for paint application in order to continue the applications of wagons during work on existing cabins in the Technicentre. For this, we run different batch studies (electrical, ventilation, mechanical, ...), organized the project and follow its installation and commissioning.

IMPROVEMENT OF OPERATORS WORKING CONDITIONS

St Quentin – France

Following an analysis of their local MBK plant have used our services in order to perform several tasks to improve the working conditions of operators such as:
# Dehumidification equipment rooms.
# The breakdown products storage area Solvent.
# The study of vapor collection system and exhaust during engine testing thermal.

MAINTAINING OF VENTILATION PERFORMANCES

St Quentin – France

We realize, on-site campaigns of ventilation measurements every three months to check the balance and efficiency of all systems of air conditioning for the cabins, ovens and other technical areas.
At each visit, a detailed report optimizes the equipment and prevent any future maintenance actions.

OPTIMISATION OF VENTILATIONS PERFORMANCES

Feuquières – France

Following a complete analysis of ventilation systems, we have identified disturbances on lines. To obtain a balance airflow and proper operation of all the equipment, we establish these settings and advise our customer on how to install control equipment with training staff to maintain these performances.

OVENS AUDITS

Flins – France

Following the completion of work on two ovens of lacquers application line in Renault site, we realized for DÜRR, an inventory of the measures after work and site supervision.

PROJECT MANAGEMENT

Revoz – Slovenia

Our service of Project Manager for Renault is to manage the expansion project of the line paint application, monitoring suppliers draft (technical alignment), assistance in decision, organization overall project, followed realization.

RESEAU AERAULIQUE

Revoz – Slovenia

We realized for the company FIRAC - SNEF group, the design studies and implementations of ventilation duct networks, air conditioning lines for mastic and varnish application site Renault - Revoz and monitoring realization by a foreman on site.

ROBOTISED CABIN OF APPLICATION P2 PRODUCT

Pitesti – Romania

We participated in the integration of two robots of application of product P2 (underbody corrosion) with vision system for positioning robots. At first we conducted studies of process and electrical integration, product distribution, accessibility of robots, mechanical interface designs, vision system, all of theimplantations. With the company FIRAC - SNEF group in charge of the overall project and automation, we installed all the equipments, produced programming and robot trajectories, while ensuring coordination site then we performed commissioning.